MTC for Full Gas Heating Installations; 2025-2029 (HO HT 24 033)
A Contract Award Notice
by NORTH LANARKSHIRE COUNCIL
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- 23.5 month (est.)
- Value
- £40M
- Sector
- INDUSTRIAL
- Published
- 05 Sep 2025
- Delivery
- To 26 Aug 2027 (est.)
- Deadline
- n/a
Concepts
Location
Motherwell
2 buyers
- North Lanarkshire Council Motherwell
2 suppliers
- Saltire Facilities Management Bellshill
- Gas Call Services Dunfermline
Description
It is proposed that the scope of services comprise of the removal and replacement of gas heating systems including boilers, radiators, pipework and associated works. The total estimated Contract value is up to 40,000,000 GBP split over two lots as follows: Lot 1 – total value up to 24,000,000 GBP Lot 2 – total value up to 16,000,000 GBP
Lot Division
1 | Gas Heating System Installations The removal and replacement of gas heating systems including boilers, radiators, pipework and associated works; total value up to 24,000,000 GBP. Tenderers should be aware that where they are bidding for both Lots 1 and 2 of the MTC, and should they be identified as submitting the most economically advantageous tender for Lot 1, there Tender for Lot 2 will be excluded on the basis of the Councils intention to appoint a single / separate contractor to each Lot. Award Criteria
| ||||||||||||||||
2 | Gas Heating System Installations The removal and replacement of gas heating systems including boilers, radiators, pipework and associated works; total value up to 16,000,000 GBP. Tenderers should be aware that where they are bidding for both Lots 1 and 2 of the MTC, and should they be identified as submitting the most economically advantageous tender for Lot 1, there Tender for Lot 2 will be excluded on the basis of the Councils intention to appoint a single / separate contractor to each Lot. Award Criteria
|
Award Detail
1 | Saltire Facilities Management (Bellshill)
|
2 | Gas Call Services (Dunfermline)
|
CPV Codes
- 45331100 - Central-heating installation work
Indicators
- Award on basis of price.
Other Information
Bidders should read and refer to the ITT. Failure to comply with the instructions contained within the ITT may result in a Bidder's submission being rejected. Economic operators may be excluded from this competition if they are in any of the situations referred to in Regulation 58 of the Public Contracts (Scotland) Regulations 2015. This notice retrospectively completes the Contract Award. The contract period is 22 January 2025 until 21 January 2029. For avoidance of doubt, this is not a new open requirement. (SC Ref:809431)
Reference
- FTS 054214-2025