Scheme Delivery Framework 2
A Tender Notice
by NATIONAL HIGHWAYS
- Source
- Find a Tender
- Type
- Framework (Works)
- Duration
- 8 year
- Value
- £9B-£14B
- Sector
- CONSTRUCTION
- Published
- 29 Sep 2025
- Delivery
- 15 Sep 2027 to 15 Sep 2035
- Deadline
- n/a
Concepts
Location
North East England:
1 buyer
- National Highways Guildford
Description
National Highways Scheme Delivery Framework 2 (SDF2) will play a pivotal role in renewing and enhancing England’s Strategic Road Network (SRN). Covering over 4,500 miles of motorways and major A roads, the SRN is a vital component of the UK’s transport infrastructure, carrying a third of all traffic and two-thirds of freight. SDF2 is designed to ensure this network remains dependable, durable, and safe, while also delivering value for money. SDF2 builds on the foundations of its predecessor frameworks - the original Scheme Delivery Framework (SDF) and the Pavement Delivery Framework (PDF). With an estimated value of £14.5 billion and a projected 8-year duration, SDF2 represents a significant investment in the future of the UK’s road infrastructure. The framework will focus on renewing and maintaining existing assets, with a strong emphasis on collaboration, standardisation, and productivity. It aims to focus spending on long-term asset improvements rather than temporary fixes, while simplifying commercial models to reduce administrative burden. SDF2 will be an enabled framework to facilitate usage by Lower Thames Crossing (LTC) and Maintenance and Response (M&R) suppliers. The new framework represents a forward-looking approach by National Highways aimed at delivering high-quality, efficient infrastructure projects that align with the evolving needs of stakeholders and road users. While the SDF has facilitated numerous successful projects across the SRN, the SDF2 is expected to build on this foundation with innovations and improvements that respond to emerging demands in safety, transport and sustainability. In late 2024, National Highways held an extensive round of preliminary market engagement, consisting of six face-to-face workshops and two online events, designed to incorporate input from the supply chain. The feedback gathered at market engagement informed the development of the SDF2 strategy, and material from the events can be found here: https://highways.sharepoint.com/:f:/s/NationalHighwaysProcurement-MaterialforExt... For more information on the operation of SDF2, please refer to the Information Memorandum.
Lot Division
| 1 | Main Contractor (National)
This Lot 1 is for more complex Work Orders for which the Client requires a single prime supplier to both deliver (via self-delivery and sub-contracts) and manage schemes which could include any or all of the scope for other Lots (excluding the design Lots), including the option to deliver scheme(s) as design & build. The Lot covers the supply of products, materials, plant, equipment and people to carry out construction, removal activities and Framework Mobilisation. The procurement procedure for this Lot will be Process 1. |
| 4 | Tunnels (National)
This Lot 4 covers the supply of materials, plant, equipment and people to carry out construction, commissioning, integrated commissioning, integrated testing and removal activities within and related to road tunnels, including the option to deliver scheme(s) as design & build. Scope includes but not limited to • electrical systems, • mechanical systems, • technology systems and • design and installation of temporary works. Suppliers may be provided with specialist technology assets by the Client. Other duties This Lot also includes the following activities • Framework Mobilisation, • mobilisation for the purpose of the activities set out above, • carrying out surveys, • fault finding and diagnostics, • pre-construction services, • early engagement, • undertaking the principal designer role as required by the Client, • undertaking the principal contractor role as required by the Client, • the provision of welfare facilities, • the delivery of incident response (rapid response), • the management of network occupancy, • community and • the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. |
| 3 | General Civils, Drainage & Concrete (North East)
This Lot (2/NE) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: • highway drainage assets, • pipes, • ditches, • swales, • ponds, • the control and disposal of contaminated material, • associated technology works, • earthworks, • ducting, • kerbing, • footways, • rigid pavement, • retexturing of exposed concrete pavement, • site clearance, • brick, block and stonework, • piling, • temporary works required to ensure a safe method of working, • demolition, • structural steelworks, • reinforced earth abutments, • wingwalls, • retaining walls, • concrete, • asbestos removal (planned), • earthwork stabilisation, • counterfort drains, • soil nailing, • grounder anchors, • slope netting (rock and soil), • rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and • ‘innovative’ stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the “Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works” (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · undertaking the lead contractor role as required by any Work Order, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20. |
| 4 | General Civils, Drainage & Concrete (North West)
This Lot (2/NW) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: • highway drainage assets, • pipes, • ditches, • swales, • ponds, • the control and disposal of contaminated material, • associated technology works, • earthworks, • ducting, • kerbing, • footways, • rigid pavement, • retexturing of exposed concrete pavement, • site clearance, • brick, block and stonework, • piling, • temporary works required to ensure a safe method of working, • demolition, • structural steelworks, • reinforced earth abutments, • wingwalls, • retaining walls, • concrete, • asbestos removal (planned), • earthwork stabilisation, • counterfort drains, • soil nailing, • grounder anchors, • slope netting (rock and soil), • rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and • ‘innovative’ stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the “Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works” (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · undertaking the lead contractor role as required by any Work Order, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20. |
| 5 | General Civils, Drainage & Concrete (South East)
This Lot (2/SE) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: • highway drainage assets, • pipes, • ditches, • swales, • ponds, • the control and disposal of contaminated material, • associated technology works, • earthworks, • ducting, • kerbing, • footways, • rigid pavement, • retexturing of exposed concrete pavement, • site clearance, • brick, block and stonework, • piling, • temporary works required to ensure a safe method of working, • demolition, • structural steelworks, • reinforced earth abutments, • wingwalls, • retaining walls, • concrete, • asbestos removal (planned), • earthwork stabilisation, • counterfort drains, • soil nailing, • grounder anchors, • slope netting (rock and soil), • rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and • ‘innovative’ stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the “Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works” (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · undertaking the lead contractor role as required by any Work Order, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20. |
| 6 | General Civils, Drainage & Concrete (South West)
This Lot (2/SW) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: • highway drainage assets, • pipes, • ditches, • swales, • ponds, • the control and disposal of contaminated material, • associated technology works, • earthworks, • ducting, • kerbing, • footways, • rigid pavement, • retexturing of exposed concrete pavement, • site clearance, • brick, block and stonework, • piling, • temporary works required to ensure a safe method of working, • demolition, • structural steelworks, • reinforced earth abutments, • wingwalls, • retaining walls, • concrete, • asbestos removal (planned), • earthwork stabilisation, • counterfort drains, • soil nailing, • grounder anchors, • slope netting (rock and soil), • rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and • ‘innovative’ stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the “Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works” (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · undertaking the lead contractor role as required by any Work Order, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20. |
| 7 | General Civils, Drainage & Concrete (Midlands)
This Lot (2/M) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: • highway drainage assets, • pipes, • ditches, • swales, • ponds, • the control and disposal of contaminated material, • associated technology works, • earthworks, • ducting, • kerbing, • footways, • rigid pavement, • retexturing of exposed concrete pavement, • site clearance, • brick, block and stonework, • piling, • temporary works required to ensure a safe method of working, • demolition, • structural steelworks, • reinforced earth abutments, • wingwalls, • retaining walls, • concrete, • asbestos removal (planned), • earthwork stabilisation, • counterfort drains, • soil nailing, • grounder anchors, • slope netting (rock and soil), • rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and • ‘innovative’ stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the “Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works” (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · undertaking the lead contractor role as required by any Work Order, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20. |
| 8 | General Civils, Drainage & Concrete (East of England)
This Lot (2/E) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: • highway drainage assets, • pipes, • ditches, • swales, • ponds, • the control and disposal of contaminated material, • associated technology works, • earthworks, • ducting, • kerbing, • footways, • rigid pavement, • retexturing of exposed concrete pavement, • site clearance, • brick, block and stonework, • piling, • temporary works required to ensure a safe method of working, • demolition, • structural steelworks, • reinforced earth abutments, • wingwalls, • retaining walls, • concrete, • asbestos removal (planned), • earthwork stabilisation, • counterfort drains, • soil nailing, • grounder anchors, • slope netting (rock and soil), • rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and • ‘innovative’ stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the “Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works” (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · undertaking the lead contractor role as required by any Work Order, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20. |
| 9 | Pavements (North East)
This Lot (3/NE) covers: • highway maintenance, renewal, small improvements and associated services for pavements and • the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities · the delivery and management of works with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · the delivery of incident response (rapid response), · pre-construction services, · early engagement, · community and · the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15. |
| 10 | Pavements (North West)
This Lot (3/NW) covers: • highway maintenance, renewal, small improvements and associated services for pavements and • the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities · the delivery and management of works with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · the delivery of incident response (rapid response), · pre-construction services, · early engagement, · community and · the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15. |
| 11 | Pavements (South East)
This Lot (3/SE) covers: • highway maintenance, renewal, small improvements and associated services for pavements and • the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities · the delivery and management of works with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · the delivery of incident response (rapid response), · pre-construction services, · early engagement, · community and · the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15. |
| 12 | Pavements (South West)
This Lot (3/SW) covers: • highway maintenance, renewal, small improvements and associated services for pavements and • the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities · the delivery and management of works with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · the delivery of incident response (rapid response), · pre-construction services, · early engagement, · community and · the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15. |
| 13 | Pavements (Midlands)
This Lot (3/M) covers: • highway maintenance, renewal, small improvements and associated services for pavements and • the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities · the delivery and management of works with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · the delivery of incident response (rapid response), · pre-construction services, · early engagement, · community and · the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15. |
| 14 | Pavements (East of England)
This Lot (3/E) covers: • highway maintenance, renewal, small improvements and associated services for pavements and • the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities · the delivery and management of works with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · the delivery of incident response (rapid response), · pre-construction services, · early engagement, · community and · the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15. |
| 15 | Technology Design (North East, North West & Midlands)
This Lot (5.1/North) covers the design of highway maintenance, renewal and small improvement and associated services with a primary focus on technology including: • structures, • landscaping, • pavements, • drainage, • traffic modelling, • traffic signals, • geometrical designs, • geotechnics, • technology, • lighting, • motorway communications, • environmental, • noise quality (including non-invasive surveys), • air quality (including non-invasive surveys), • vehicle restraint systems, • depots, • preparation of contract documents, • site supervision and • stakeholder engagement/consultation. Other duties This Lot also includes the following activities: · Framework Mobilisation, · framework mobilisation for the purpose of the activities set out above, · carrying out surveys (intrusive and non-intrusive), · pre-construction services, · early engagement, · undertaking the principal designer role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for both Sublots within Lot 5.1 is 8 |
| 16 | Technology Design (South East, South West & East of England)
This Lot (5.1/South) covers the design of highway maintenance, renewal and small improvement and associated services with a primary focus on technology including: • structures, • landscaping, • pavements, • drainage, • traffic modelling, • traffic signals, • geometrical designs, • geotechnics, • technology, • lighting, • motorway communications, • environmental, • noise quality (including non-invasive surveys), • air quality (including non-invasive surveys), • vehicle restraint systems, • depots, • preparation of contract documents, • site supervision and • stakeholder engagement/consultation. Other duties This Lot also includes the following activities: · Framework Mobilisation, · framework mobilisation for the purpose of the activities set out above, · carrying out surveys (intrusive and non-intrusive), · pre-construction services, · early engagement, · undertaking the principal designer role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for both Sublots within Lot 5.1 is 8 |
| 17 | Design (North East)
This Lot (5.2/NE) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: • structures, • landscaping, • pavements, • drainage, • earthworks, • traffic signals and signs, • geometrical designs, • geotechnics, • lighting, • motorway communications, • environmental, • noise quality (including non-invasive surveys), • air quality (including non-invasive surveys), • vehicle restraint systems, • depots, • preparation of contract documents, • site supervision, • stakeholder engagement/consultation • non-technology schemes that have technology design. Other duties This Lot also includes the following activities; · Framework Mobilisation, · framework mobilisation for the purpose of the activities set out in above, · carrying out surveys (intrusive and non-intrusive), · early engagement, · design validation, · undertaking the principal designer role as required by the Client, · the management of network occupancy, · undertaking the role of technical advisor as required by the Client, · undertaking the role of independent works examiner as required by the Client, · modelling services (e.g. traffic and economic), · supporting governance submissions for both the Client and DfT, · creating business cases in line with the Treasury green book requirements, · land referencing, · planning submissions including development consent orders (DCO), · the delivery of incident response (rapid response), · demobilisation, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15 |
| 18 | Design (North West)
This Lot (5.2/NW) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: • structures, • landscaping, • pavements, • drainage, • earthworks, • traffic signals and signs, • geometrical designs, • geotechnics, • lighting, • motorway communications, • environmental, • noise quality (including non-invasive surveys), • air quality (including non-invasive surveys), • vehicle restraint systems, • depots, • preparation of contract documents, • site supervision, • stakeholder engagement/consultation • non-technology schemes that have technology design. Other duties This Lot also includes the following activities; · Framework Mobilisation, · framework mobilisation for the purpose of the activities set out in above, · carrying out surveys (intrusive and non-intrusive), · early engagement, · design validation, · undertaking the principal designer role as required by the Client, · the management of network occupancy, · undertaking the role of technical advisor as required by the Client, · undertaking the role of independent works examiner as required by the Client, · modelling services (e.g. traffic and economic), · supporting governance submissions for both the Client and DfT, · creating business cases in line with the Treasury green book requirements, · land referencing, · planning submissions including development consent orders (DCO), · the delivery of incident response (rapid response), · demobilisation, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15 |
| 19 | Design (South East)
This Lot (5.2/SE) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: • structures, • landscaping, • pavements, • drainage, • earthworks, • traffic signals and signs, • geometrical designs, • geotechnics, • lighting, • motorway communications, • environmental, • noise quality (including non-invasive surveys), • air quality (including non-invasive surveys), • vehicle restraint systems, • depots, • preparation of contract documents, • site supervision, • stakeholder engagement/consultation • non-technology schemes that have technology design. Other duties This Lot also includes the following activities; · Framework Mobilisation, · framework mobilisation for the purpose of the activities set out in above, · carrying out surveys (intrusive and non-intrusive), · early engagement, · design validation, · undertaking the principal designer role as required by the Client, · the management of network occupancy, · undertaking the role of technical advisor as required by the Client, · undertaking the role of independent works examiner as required by the Client, · modelling services (e.g. traffic and economic), · supporting governance submissions for both the Client and DfT, · creating business cases in line with the Treasury green book requirements, · land referencing, · planning submissions including development consent orders (DCO), · the delivery of incident response (rapid response), · demobilisation, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15 |
| 20 | Design (South West)
This Lot (5.2/SW) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: • structures, • landscaping, • pavements, • drainage, • earthworks, • traffic signals and signs, • geometrical designs, • geotechnics, • lighting, • motorway communications, • environmental, • noise quality (including non-invasive surveys), • air quality (including non-invasive surveys), • vehicle restraint systems, • depots, • preparation of contract documents, • site supervision, • stakeholder engagement/consultation • non-technology schemes that have technology design. Other duties This Lot also includes the following activities; · Framework Mobilisation, · framework mobilisation for the purpose of the activities set out in above, · carrying out surveys (intrusive and non-intrusive), · early engagement, · design validation, · undertaking the principal designer role as required by the Client, · the management of network occupancy, · undertaking the role of technical advisor as required by the Client, · undertaking the role of independent works examiner as required by the Client, · modelling services (e.g. traffic and economic), · supporting governance submissions for both the Client and DfT, · creating business cases in line with the Treasury green book requirements, · land referencing, · planning submissions including development consent orders (DCO), · the delivery of incident response (rapid response), · demobilisation, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15 |
| 21 | Design (Midlands)
This Lot (5.2/M) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: • structures, • landscaping, • pavements, • drainage, • earthworks, • traffic signals and signs, • geometrical designs, • geotechnics, • lighting, • motorway communications, • environmental, • noise quality (including non-invasive surveys), • air quality (including non-invasive surveys), • vehicle restraint systems, • depots, • preparation of contract documents, • site supervision, • stakeholder engagement/consultation • non-technology schemes that have technology design. Other duties This Lot also includes the following activities; · Framework Mobilisation, · framework mobilisation for the purpose of the activities set out in above, · carrying out surveys (intrusive and non-intrusive), · early engagement, · design validation, · undertaking the principal designer role as required by the Client, · the management of network occupancy, · undertaking the role of technical advisor as required by the Client, · undertaking the role of independent works examiner as required by the Client, · modelling services (e.g. traffic and economic), · supporting governance submissions for both the Client and DfT, · creating business cases in line with the Treasury green book requirements, · land referencing, · planning submissions including development consent orders (DCO), · the delivery of incident response (rapid response), · demobilisation, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15 |
| 22 | Design (East of England)
This Lot (5.2/E) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: • structures, • landscaping, • pavements, • drainage, • earthworks, • traffic signals and signs, • geometrical designs, • geotechnics, • lighting, • motorway communications, • environmental, • noise quality (including non-invasive surveys), • air quality (including non-invasive surveys), • vehicle restraint systems, • depots, • preparation of contract documents, • site supervision, • stakeholder engagement/consultation • non-technology schemes that have technology design. Other duties This Lot also includes the following activities; · Framework Mobilisation, · framework mobilisation for the purpose of the activities set out in above, · carrying out surveys (intrusive and non-intrusive), · early engagement, · design validation, · undertaking the principal designer role as required by the Client, · the management of network occupancy, · undertaking the role of technical advisor as required by the Client, · undertaking the role of independent works examiner as required by the Client, · modelling services (e.g. traffic and economic), · supporting governance submissions for both the Client and DfT, · creating business cases in line with the Treasury green book requirements, · land referencing, · planning submissions including development consent orders (DCO), · the delivery of incident response (rapid response), · demobilisation, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15 |
| 23 | Traffic Management (North East)
This Lot (6/NE) covers the design, supply of materials, plant and people and equipment for the: • installation, maintenance and removal of temporary traffic management, • installation, maintenance and removal of temporary safety barrier systems, • installation, maintenance and removal of temporary speed enforcement systems, • installation, maintenance and removal of temporary CCTV systems, • management of breakdown recovery services, • installation, maintenance and removal of temporary road markings and road studs and • removal of existing road markings and road studs. Other duties This Lot also includes the following activities: · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy and · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15 |
| 24 | Traffic Management (North West)
This Lot (6/NW) covers the design, supply of materials, plant and people and equipment for the: • installation, maintenance and removal of temporary traffic management, • installation, maintenance and removal of temporary safety barrier systems, • installation, maintenance and removal of temporary speed enforcement systems, • installation, maintenance and removal of temporary CCTV systems, • management of breakdown recovery services, • installation, maintenance and removal of temporary road markings and road studs and • removal of existing road markings and road studs. Other duties This Lot also includes the following activities: · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy and · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15 |
| 25 | Traffic Management (South East)
This Lot (6/SE) covers the design, supply of materials, plant and people and equipment for the: • installation, maintenance and removal of temporary traffic management, • installation, maintenance and removal of temporary safety barrier systems, • installation, maintenance and removal of temporary speed enforcement systems, • installation, maintenance and removal of temporary CCTV systems, • management of breakdown recovery services, • installation, maintenance and removal of temporary road markings and road studs and • removal of existing road markings and road studs. Other duties This Lot also includes the following activities: · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy and · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15 |
| 26 | Traffic Management (South West)
This Lot (6/SW) covers the design, supply of materials, plant and people and equipment for the: • installation, maintenance and removal of temporary traffic management, • installation, maintenance and removal of temporary safety barrier systems, • installation, maintenance and removal of temporary speed enforcement systems, • installation, maintenance and removal of temporary CCTV systems, • management of breakdown recovery services, • installation, maintenance and removal of temporary road markings and road studs and • removal of existing road markings and road studs. Other duties This Lot also includes the following activities: · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy and · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15 |
| 27 | Traffic Management (Midlands)
This Lot (6/M) covers the design, supply of materials, plant and people and equipment for the: • installation, maintenance and removal of temporary traffic management, • installation, maintenance and removal of temporary safety barrier systems, • installation, maintenance and removal of temporary speed enforcement systems, • installation, maintenance and removal of temporary CCTV systems, • management of breakdown recovery services, • installation, maintenance and removal of temporary road markings and road studs and • removal of existing road markings and road studs. Other duties This Lot also includes the following activities: · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy and · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15 |
| 28 | Traffic Management (East of England)
This Lot (6/E) covers the design, supply of materials, plant and people and equipment for the: • installation, maintenance and removal of temporary traffic management, • installation, maintenance and removal of temporary safety barrier systems, • installation, maintenance and removal of temporary speed enforcement systems, • installation, maintenance and removal of temporary CCTV systems, • management of breakdown recovery services, • installation, maintenance and removal of temporary road markings and road studs and • removal of existing road markings and road studs. Other duties This Lot also includes the following activities: · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy and · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15 |
| 29 | Structures (North East)
This Lot (7/NE) covers the supply of materials, plant and people for the: • installation of temporary works, • application of maintenance painting systems including specialist corrosion protection systems, • removal, installation and repair of concrete on highway structures, • removal, installation and repair of concrete bridge parapets, • removal, installation and repair of bridge bearings and • remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15 |
| 30 | Structures (North West)
This Lot (7/NW) covers the supply of materials, plant and people for the: • installation of temporary works, • application of maintenance painting systems including specialist corrosion protection systems, • removal, installation and repair of concrete on highway structures, • removal, installation and repair of concrete bridge parapets, • removal, installation and repair of bridge bearings and • remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15 |
| 31 | Structures (South East)
This Lot (7/SE) covers the supply of materials, plant and people for the: • installation of temporary works, • application of maintenance painting systems including specialist corrosion protection systems, • removal, installation and repair of concrete on highway structures, • removal, installation and repair of concrete bridge parapets, • removal, installation and repair of bridge bearings and • remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15 |
| 32 | Structures (South West)
This Lot (7/SW) covers the supply of materials, plant and people for the: • installation of temporary works, • application of maintenance painting systems including specialist corrosion protection systems, • removal, installation and repair of concrete on highway structures, • removal, installation and repair of concrete bridge parapets, • removal, installation and repair of bridge bearings and • remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15 |
| 33 | Structures (Midlands)
This Lot (7/M) covers the supply of materials, plant and people for the: • installation of temporary works, • application of maintenance painting systems including specialist corrosion protection systems, • removal, installation and repair of concrete on highway structures, • removal, installation and repair of concrete bridge parapets, • removal, installation and repair of bridge bearings and • remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15 |
| 34 | Structures (East of England)
This Lot (7/E) covers the supply of materials, plant and people for the: • installation of temporary works, • application of maintenance painting systems including specialist corrosion protection systems, • removal, installation and repair of concrete on highway structures, • removal, installation and repair of concrete bridge parapets, • removal, installation and repair of bridge bearings and • remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15 |
| 35 | Joints & Waterproofing (North East)
This Lot (8/NE) covers the supply of materials, plant and people for the installation, removal of and repair work to: • highways structure expansion joints, • waterproofing systems, • associated concrete repair, • testing of existing waterproofing systems, and • installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out above · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15 |
| 36 | Joints & Waterproofing (North West)
This Lot (8/NW) covers the supply of materials, plant and people for the installation, removal of and repair work to: • highways structure expansion joints, • waterproofing systems, • associated concrete repair, • testing of existing waterproofing systems, and • installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out above · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15 |
| 37 | Joints & Waterproofing (South East)
This Lot (8/SE) covers the supply of materials, plant and people for the installation, removal of and repair work to: • highways structure expansion joints, • waterproofing systems, • associated concrete repair, • testing of existing waterproofing systems, and • installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out above · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15 |
| 38 | Joints & Waterproofing (South West)
This Lot (8/SW) covers the supply of materials, plant and people for the installation, removal of and repair work to: • highways structure expansion joints, • waterproofing systems, • associated concrete repair, • testing of existing waterproofing systems, and • installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out above · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15 |
| 39 | Joints & Waterproofing (Midlands)
This Lot (8/M) covers the supply of materials, plant and people for the installation, removal of and repair work to: • highways structure expansion joints, • waterproofing systems, • associated concrete repair, • testing of existing waterproofing systems, and • installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out above · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15 |
| 40 | Joints & Waterproofing (East of England)
This Lot (8/E) covers the supply of materials, plant and people for the installation, removal of and repair work to: • highways structure expansion joints, • waterproofing systems, • associated concrete repair, • testing of existing waterproofing systems, and • installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out above · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15 |
| 41 | Landscaping (North East)
This Lot (9/NE) covers the supply of materials, plant and people to carry out landscaping and ecology works including: • weed control, • wildlife control, • ground preparation, • seeding, • turfing, • boundary fencing, • planting, • watering, • tree and shrub maintenance, • creation and management of waterbodies as and any other ecological measures and • landscape clearance. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in section above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in section above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20 |
| 42 | Landscaping (North West)
This Lot (9/NW) covers the supply of materials, plant and people to carry out landscaping and ecology works including: • weed control, • wildlife control, • ground preparation, • seeding, • turfing, • boundary fencing, • planting, • watering, • tree and shrub maintenance, • creation and management of waterbodies as and any other ecological measures and • landscape clearance. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in section above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in section above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20 |
| 43 | Landscaping (South East)
This Lot (9/SE) covers the supply of materials, plant and people to carry out landscaping and ecology works including: • weed control, • wildlife control, • ground preparation, • seeding, • turfing, • boundary fencing, • planting, • watering, • tree and shrub maintenance, • creation and management of waterbodies as and any other ecological measures and • landscape clearance. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in section above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in section above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20 |
| 44 | Landscaping (South West)
This Lot (9/SW) covers the supply of materials, plant and people to carry out landscaping and ecology works including: • weed control, • wildlife control, • ground preparation, • seeding, • turfing, • boundary fencing, • planting, • watering, • tree and shrub maintenance, • creation and management of waterbodies as and any other ecological measures and • landscape clearance. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in section above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in section above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20 |
| 45 | Landscaping (Midlands)
This Lot (9/M) covers the supply of materials, plant and people to carry out landscaping and ecology works including: • weed control, • wildlife control, • ground preparation, • seeding, • turfing, • boundary fencing, • planting, • watering, • tree and shrub maintenance, • creation and management of waterbodies as and any other ecological measures and • landscape clearance. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in section above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in section above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20 |
| 46 | Landscaping (East of England)
This Lot (9/E) covers the supply of materials, plant and people to carry out landscaping and ecology works including: • weed control, • wildlife control, • ground preparation, • seeding, • turfing, • boundary fencing, • planting, • watering, • tree and shrub maintenance, • creation and management of waterbodies as and any other ecological measures and • landscape clearance. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in section above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in section above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20 |
| 47 | Road Markings (North East)
This Lot (10/NE) covers the supply of materials, plant and people for the installation and removal of: • highway road markings, • road studs, • installation and removal of temporary road markings and road studs, • high friction surfacing, • crack sealing and • pavement joint repair. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20 |
| 48 | Road Markings (North West)
This Lot (10/NW) covers the supply of materials, plant and people for the installation and removal of: • highway road markings, • road studs, • installation and removal of temporary road markings and road studs, • high friction surfacing, • crack sealing and • pavement joint repair. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20 |
| 49 | Road Markings (South East)
This Lot (10/SE) covers the supply of materials, plant and people for the installation and removal of: • highway road markings, • road studs, • installation and removal of temporary road markings and road studs, • high friction surfacing, • crack sealing and • pavement joint repair. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20 |
| 50 | Road Markings (South West)
This Lot (10/SW) covers the supply of materials, plant and people for the installation and removal of: • highway road markings, • road studs, • installation and removal of temporary road markings and road studs, • high friction surfacing, • crack sealing and • pavement joint repair. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20 |
| 51 | Road Markings (Midlands)
This Lot (10/M) covers the supply of materials, plant and people for the installation and removal of: • highway road markings, • road studs, • installation and removal of temporary road markings and road studs, • high friction surfacing, • crack sealing and • pavement joint repair. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20 |
| 52 | Road Markings (East of England)
This Lot (10/E) covers the supply of materials, plant and people for the installation and removal of: • highway road markings, • road studs, • installation and removal of temporary road markings and road studs, • high friction surfacing, • crack sealing and • pavement joint repair. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20 |
| 53 | Signs & Lighting (North East)
This Lot (11/NE) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: • road lighting and • traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of section above, · pre-construction services, · elements of supplier design, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · the management of network occupancy, · temporary works, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20 |
| 54 | Signs & Lighting (North West)
This Lot (11/NW) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: • road lighting and • traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of section above, · pre-construction services, · elements of supplier design, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · the management of network occupancy, · temporary works, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20 |
| 55 | Signs & Lighting (South East)
This Lot (11/SE) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: • road lighting and • traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of section above, · pre-construction services, · elements of supplier design, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · the management of network occupancy, · temporary works, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20 |
| 56 | Signs & Lighting (South West)
This Lot (11/SW) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: • road lighting and • traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of section above, · pre-construction services, · elements of supplier design, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · the management of network occupancy, · temporary works, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20 |
| 57 | Signs & Lighting (Midlands)
This Lot (11/M) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: • road lighting and • traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of section above, · pre-construction services, · elements of supplier design, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · the management of network occupancy, · temporary works, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20 |
| 58 | Signs & Lighting (East of England)
This Lot (11/E) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: • road lighting and • traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of section above, · pre-construction services, · elements of supplier design, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · the management of network occupancy, · temporary works, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20 |
| 59 | Vehicle Restraint Systems / Road Restraint Systems (North East)
This Lot (12/NE) covers the supply of materials, plant and people for the: • installation and removal of road restraint systems (vehicle and pedestrian), • installation and repair of non-concrete bridge parapets, • push tests of existing road restraint systems, • temporary works and • installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20 |
| 60 | Vehicle Restraint Systems / Road Restraint Systems (North West)
This Lot (12/NW) covers the supply of materials, plant and people for the: installation and removal of road restraint systems (vehicle and pedestrian), • installation and repair of non-concrete bridge parapets, • push tests of existing road restraint systems, • temporary works and • installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20 |
| 61 | Vehicle Restraint Systems / Road Restraint Systems (South East)
This Lot (12/SE) covers the supply of materials, plant and people for the: installation and removal of road restraint systems (vehicle and pedestrian), • installation and repair of non-concrete bridge parapets, • push tests of existing road restraint systems, • temporary works and • installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20 |
| 62 | Vehicle Restraint Systems / Road Restraint Systems (South West)
This Lot (12/SW) covers the supply of materials, plant and people for the: installation and removal of road restraint systems (vehicle and pedestrian), • installation and repair of non-concrete bridge parapets, • push tests of existing road restraint systems, • temporary works and • installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20 |
| 63 | Vehicle Restraint Systems / Road Restraint Systems (Midlands)
This Lot (12/M) covers the supply of materials, plant and people for the: installation and removal of road restraint systems (vehicle and pedestrian), • installation and repair of non-concrete bridge parapets, • push tests of existing road restraint systems, • temporary works and • installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20 |
| 64 | Vehicle Restraint Systems / Road Restraint Systems (East of England)
This Lot (12/E) covers the supply of materials, plant and people for the: installation and removal of road restraint systems (vehicle and pedestrian), • installation and repair of non-concrete bridge parapets, • push tests of existing road restraint systems, • temporary works and • installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20 |
Renewal Options
National Highways has identified a number of known risks that may occur during the term for the framework agreement. These will be set out in the draft contract documents as Compensation Events. Should any of the known risks materialise, National Highways reserves the right to make a modification in accordance with Schedule 8 of the Procurement Act 2023.
Award Criteria
| Quality Submission | As part of the Quality Submission at Tender stage, Suppliers will be required to respond to a number of Quality Questions based on the themes below. - Health and Safety (Lot specific) - Stakeholder Management and Collaboration (Framework level) - Commercial (Framework level) - Delivery (Lot specific) - Organisation and Resources (Framework level) - Social Value (Framework level) Each Quality Question will be weighted individually to reach the full percentage weighting (i.e. 70%). More information on the weightings and scoring methodology will be detailed in the Invitation to Tender documents, following supplier shortlisting at CoP stage. |
| Commercial Submission | As part of the Commercial Submission at Tender stage, National Highways will use both the Weighted Value for Money Index (WVFMI) and the Relative Evaluation method to assess the tenders, depending on the Lots the suppliers tender for. More information on the tender assessment procedure will be detailed in the Invitation to Tender documents, following supplier shortlisting at CoP stage. |
CPV Codes
- 45000000 - Construction work
- 45111240 - Ground-drainage work
- 45200000 - Works for complete or part construction and civil engineering work
- 45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
- 45233100 - Construction work for highways, roads
- 45233121 - Main road construction works
- 45233130 - Construction work for highways
- 45233141 - Road-maintenance works
- 45233142 - Road-repair works
- 50000000 - Repair and maintenance services
- 71311000 - Civil engineering consultancy services
- 45233222 - Paving and asphalting works
- 45233139 - Highway maintenance work
- 71320000 - Engineering design services
- 72224000 - Project management consultancy services
- 14213000 - Macadam, tarmac and tar sands
- 45233220 - Surface work for roads
- 45233223 - Carriageway resurfacing works
- 45233251 - Resurfacing works
- 34993100 - Tunnel lighting
- 45247200 - Construction work for dams and similar fixed structures
- 45221000 - Construction work for bridges and tunnels, shafts and subways
- 45221241 - Road tunnel construction work
- 45221247 - Tunnelling works
- 45221248 - Tunnel linings construction work
- 63712320 - Tunnel operation services
- 71322000 - Engineering design services for the construction of civil engineering works
- 71322500 - Engineering-design services for traffic installations
- 71356200 - Technical assistance services
- 71356300 - Technical support services
- 71530000 - Construction consultancy services
- 73210000 - Research consultancy services
- 73300000 - Design and execution of research and development
- 73420000 - Pre-feasibility study and technological demonstration
- 34923000 - Road traffic-control equipment
- 34928100 - Crash barriers
- 34928110 - Road barriers
- 34928300 - Safety barriers
- 34970000 - Traffic-monitoring equipment
- 34972000 - Traffic-flow measuring system
- 45213310 - Construction work for buildings relating to road transport
- 45233150 - Traffic-calming works
- 45233280 - Erection of road-barriers
- 45316210 - Installation of traffic monitoring equipment
- 45316212 - Installation of traffic lights
- 45316213 - Installation of traffic guidance equipment
- 45340000 - Fencing, railing and safety equipment installation work
- 50200000 - Repair, maintenance and associated services related to aircraft, railways, roads and marine equipment
- 50230000 - Repair, maintenance and associated services related to roads and other equipment
- 50232000 - Maintenance services of public-lighting installations and traffic lights
- 50232200 - Traffic-signal maintenance services
- 63712000 - Support services for road transport
- 63712200 - Highway operation services
- 63712700 - Traffic control services
- 63712710 - Traffic monitoring services
- 44000000 - Construction structures and materials; auxiliary products to construction (except electric apparatus)
- 44112000 - Miscellaneous building structures
- 44210000 - Structures and parts of structures
- 44212120 - Structures of bridges
- 44212300 - Structures and parts
- 44212317 - Scaffolding structures
- 44212320 - Miscellaneous structures
- 44212380 - Parts of structures
- 45223000 - Structures construction work
- 45223100 - Assembly of metal structures
- 45223110 - Installation of metal structures
- 45223500 - Reinforced-concrete structures
- 45223800 - Assembly and erection of prefabricated structures
- 45233120 - Road construction works
- 45233131 - Construction work for elevated highways
- 45442121 - Painting work of structures
- 71631400 - Technical inspection services of engineering structures
- 90912000 - Blast-cleaning services for tubular structures
- 45233210 - Surface work for highways
- 45233300 - Foundation work for highways, roads, streets and footpaths
- 45233310 - Foundation work for highways
- 45233320 - Foundation work for roads
- 45262300 - Concrete work
- 45442120 - Painting and protective-coating work of structures
- 39293300 - Artificial grass
- 45112700 - Landscaping work
- 77211300 - Tree-clearing services
- 77314100 - Grassing services
- 77211400 - Tree-cutting services
- 77211500 - Tree-maintenance services
- 77211600 - Tree seeding
- 77310000 - Planting and maintenance services of green areas
- 77340000 - Tree pruning and hedge trimming
- 77341000 - Tree pruning
- 92534000 - Wildlife preservation services
- 34922100 - Road markings
- 45233221 - Road-surface painting work
- 31000000 - Electrical machinery, apparatus, equipment and consumables; lighting
- 31500000 - Lighting equipment and electric lamps
- 31523000 - Illuminated signs and nameplates
- 31530000 - Parts of lamps and lighting equipment
- 34928500 - Street-lighting equipment
- 34928510 - Street-lighting columns
- 34992000 - Signs and illuminated signs
- 34992100 - Illuminated traffic signs
- 45310000 - Electrical installation work
- 45316110 - Installation of road lighting equipment
- 45316211 - Installation of illuminated road signs
- 50232100 - Street-lighting maintenance services
- 50232110 - Commissioning of public lighting installations
Indicators
- Restrictions apply to the lot award allocation.
- Options are available.
Legal Justification
The Framework Agreement will have a term of 8 years for the following reasons: - The longer framework term allows our supply chain to invest in innovation, people, and equipment, giving overall best value, maximising productivity, and the ability to meet efficiency targets. - Building collaborative relationships and understanding the different ways of working takes time (up to two years), therefore increasing the term beyond 4 years maximises that investment in time and effort within the strategic partnerships. - Reducing the number of times the Small, Medium Enterprises (SMEs) within our supply chain need to tender provides stability and longer-term business prosperity. - Results from Market Engagement showed that the supply chain preferred an 8-year framework over a 4 or 6-year framework for the reasons mentioned in the previous bullet points above.
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-0515f3
- FTS 060400-2025