Design and Build Contractors (Minor Works) Framework Agreement
A Utilities Contract Award Notice
by WESSEX WATER SERVICES LTD
- Source
- Find a Tender
- Type
- Framework (Works)
- Duration
- not specified
- Value
- ___
- Sector
- CONSTRUCTION
- Published
- 06 Oct 2025
- Delivery
- not specified
- Deadline
- n/a
Concepts
Location
Bath
1 buyer
22 suppliers
- Bartlett Contractors Sturminster Newton
- Bridges Electrical Engineers Midsomer Norton
- DMS Engineering Chippenham
- Ecogenr8 Havant
- Electrical & Pump Services Alton
- Envolve Infrastructure Leeds
- Galliford Try Construction Uxbridge
- Gel Engineering Enfield
- Hanevo Alton
- Integrated Water Services Walsall
- Mildren Construction Christchurch
- Mills Engineering Services Radstock
- Ocu Utility Services Stockport
- Onsite Central West Midlands
- Renn Consultancy Wells
- Rhames Nottingham
- Stonbury Chawston
- Trant Engineering Southampton
- Unitspark Reading
- Glanville Cleansing Ivybridge
- Network Plus Services Manchester
- United Infrastructure Water Warrington
Description
Design and build (minor works) projects, covering potable and waste water, including new works and / or the refurbishment, replacement, and maintenance of existing assets including cyclical maintenance programmes.
Lot Division
1 | Non-Infrastructure Works (potable water and wastewater) a) Potable water non-infrastructure scope includes, but is not limited to; i. Refurbishment, replacement and provision of new potable ground and surface water production assets such as enhanced slow sand filter performance, ii. Disinfection, surge protection, chemical dosing, pumping systems and supervisory control, iii. Run-to-waste facilities, cartridge filters and UV, iv. Increased power resilience, v. New service reservoirs and inspection and maintenance of existing service and storage reservoirs. b) Wastewater non-infrastructure scope includes, but is not limited to; i. Refurbishment, replacement and provision of new inlet screens, ii. MCC (Motor Control Centre) replacement and associated DNO (Distribution Network Operator) works, iii. Stormwater storage, iv. Event duration monitors, v. Settlement tanks, vi. Modular treatment equipment, vii. Digester roof replacement, viii. Chemical dosing, ix. Phosphorous removal, x. Odour control and increased power resilience. |
2 | Infrastructure Works (potable water and wastewater) a) Potable water infrastructure scope includes, but is not limited to; i. Distribution mains and lead communications pipe replacement, ii. Pressure management activities, iii. Inspection and maintenance of aqueducts, bridges and tunnels, iv. Reservoir maintenance and upgrades. b) Wastewater infrastructure programme includes, but is not limited to; i. New rising mains and their replacement, ii. Refurbishment of stormwater management systems (inc. Tanks, overflow channels, outlets etc), iii. Gravity solutions to maintain asset health and accommodate growth together with pipe bridge inspections, iv. Sustainable urban drainage (suds) and the need to respond effectively to emergency works that are generally pipeline related, v. Sewage pumping station refurbishments, enhanced power resilience, switchgear and transformer replacement |
Award Detail
1 | Bartlett Contractors (Sturminster Newton)
|
2 | Bridges Electrical Engineers (Midsomer Norton)
|
3 | DMS Engineering (Chippenham)
|
4 | Ecogenr8 (Havant)
|
5 | Electrical & Pump Services (Alton)
|
6 | Envolve Infrastructure (Leeds)
|
7 | Galliford Try Construction (Uxbridge)
|
8 | Gel Engineering (Enfield)
|
9 | Hanevo (Alton)
|
10 | Integrated Water Services (Walsall)
|
11 | Mildren Construction (Christchurch)
|
12 | Mills Engineering Services (Radstock)
|
13 | Ocu Utility Services (Stockport)
|
14 | Onsite Central (West Midlands)
|
15 | Renn Consultancy (Wells)
|
16 | Rhames (Nottingham)
|
17 | Stonbury (Chawston)
|
18 | Trant Engineering (Southampton)
|
19 | Unitspark (Reading)
|
20 | Bartlett Contractors (Sturminster Newton)
|
21 | Envolve Infrastructure (Leeds)
|
22 | Galliford Try Construction (Uxbridge)
|
23 | Glanville Cleansing (Ivybridge)
|
24 | Mildren Construction (Christchurch)
|
25 | Network Plus Services (Manchester)
|
26 | Ocu Utility Services (Stockport)
|
27 | Onsite Central (West Midlands)
|
28 | Stonbury (Chawston)
|
29 | United Infrastructure Water (Warrington)
|
30 | Unitspark (Reading)
|
Renewal Options
The Agreement will be for an initial term of 5 (five) years and may be extended for a further 3 (three) years (this may be in 12-month increments) to a maximum term of 8 (eight) years in total.
CPV Codes
- 45231300 - Construction work for water and sewage pipelines
- 45221230 - Shafts
- 45222100 - Waste-treatment plant construction work
- 45231100 - General construction work for pipelines
- 45232150 - Works related to water-distribution pipelines
- 45232400 - Sewer construction work
- 45232421 - Sewage treatment works
- 45232422 - Sludge-treatment works
- 45232423 - Sewage pumping stations construction work
- 45232430 - Water-treatment work
- 45232431 - Wastewater pumping station
- 45232440 - Construction work for sewage pipes
- 45247270 - Reservoir construction works
- 45315000 - Electrical installation work of heating and other electrical building-equipment
- 45315100 - Electrical engineering installation works
- 45350000 - Mechanical installations
- 71311000 - Civil engineering consultancy services
- 71320000 - Engineering design services
- 71322000 - Engineering design services for the construction of civil engineering works
- 71322200 - Pipeline-design services
- 71333000 - Mechanical engineering services
- 71334000 - Mechanical and electrical engineering services
Indicators
- Options are available.
Reference
- FTS 062564-2025