LINC 144 - Steel Fibre Reinforced Concrete Technology Development

A Contract Award Notice
by SELLAFIELD LIMITED

Source
Find a Tender
Type
Contract ()
Duration
not specified
Value
£151K
Sector
MISCELLANEOUS
Published
22 Oct 2025
Delivery
not specified
Deadline
n/a

Concepts

Location

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

Sellafield has a requirement to design and manufacture waste containers that are cost effective with respect to material, manufacturability, and infrastructure (throughput driven). These waste containers (WC) will be primarily used the for long-term storage of solid Low-Level Waste (LLW) which are intended to be temporarily stored in CHILW (interim storage facility) and subsequently in a Geological Disposal Facility (GDF). Steel Fibre Reinforced Concrete (SFRC) material is identified as a potential solution for a cost-effective waste container solution. Therefore, under the governance of the Manufactured Product Organisation (MPO), the Civil Structural & Architectural (CS&A) capability is carrying out a series of gated technical exercises to establish a calibrated material model which will enable the substantiation of the waste container’s performance requirements via digital simulation.

Award Detail

1 MCM Environmental Services (Bristol)
  • Linc 144
  • Reference: 1
  • Value: £150,763

CPV Codes

  • None found

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

Domains