Provision of Ground Investigation Survey for Little Hulton Solar Farm

A Contract Award Notice
by SALFORD CITY COUNCIL

Source
Find a Tender
Type
Contract (Works)
Duration
not specified
Value
£27K
Sector
CONSTRUCTION
Published
18 Jan 2023
Delivery
not specified
Deadline
n/a

Concepts

Location

Greater Manchester:

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

The survey will inform the project to construct a 3MW solar farm in Little Hulton. The project is part of the Unlocking Clean Energy Greater Manchester (UCEGM) Programme and is receiving funding from the England European Regional Development Fund (ERDF) as part of the European Structural and Investment Funds Growth Programme 2014-2020. The Department for Levelling Up, Housing and Communities is the Managing Authority for European Regional Development Fund. Established by the European Union, the European Regional Development Fund helps local areas stimulate their economic development by investing in projects which will support innovation, businesses, create jobs and local community regenerations. For more information visit https://www.gov.uk/european-growth-funding. The contractor is to undertake a Phase II interpretative ground assessment for the site at Kenyon Way, Little Hulton, Salford. The Phase II report is to assess the ground based geotechnical and environmental risks, constraints and liabilities associated with the proposed development of the site which is to be redeveloped as a ground mounted solar photovoltaic (PV) facility. The Phase II report is required to support contaminated land planning conditions, allow the design of economic foundation solutions and determine whether the local ground is suitable for the installation of the ground mounted solar photovoltaic (PV) facility. The site is approximately 3.4 ha in size. The proposed solar PV facility development will include equipment that will be generally low lying (approx. height 2.4m) and capable of screening from surrounding vantage points. There will be a galvanised security fence of approx. 2.4m height around the site and there will be a proposed substation situated to the north west of the site. HV cables and other associated equipment cables will run beneath the site. Refer to Phase 1 Geotechnical and Geo-Environmental Desk Study Report prepared by AECOM Limited for further information (report revision 0 dated 28 February 2020).

Total Quantity or Scope

This ground investigation is ERDF funded advertised on The Chest as an open tender at www.the-chest.org.uk. Closing time for bids is Monday 25th November at 2pm. Additional information:

Award Detail

1 Alliance Design (Manchester)
  • Provision of Ground Investigation Survey for Little Hulton Solar Farm
  • Reference: 001502-2023-1
  • Value: £26,850

Award Criteria

Quality and Social Value 50
price 50

CPV Codes

  • 45000000 - Construction work

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **